Quality Comes with Cost! And we make sure that the Best is choosen for you!!
Never compromise on Quality; and for the reason sometimes we are expensive due to the costs incurred for maintaining the extra efforts on both online inspections daily, and ERP methods to Analyse the Past trends, which alarms our systems for non recurring of faults.
We have our unique way of maintaing the Quality standards by procedures of inspections, Good Quality team, and Product Development team who are ready to take all challenges, when it comes to technicalities in making a perfect FIBC!
Quality Assurance
Controls 1- tests
Tests prior to starting up production
Fications of FIBCs is controlled before starting the production taking in account the job instructions specified. Before starting up the production the ordinary function of the machineries and plants are ensured and documented. Before releasing the production the following tests are performed and documented using at least one prototype of the design type intended for manufacturing:
- Design type of Bag.
- General external condition of Bag.
- Control of the dimensions of Bag.
- Condition of the connecting seams, welds and glueing.
- Condition of the filling and closing equipments of Bag.
- Correctness, durability and legibility of the FIBC.
Artworks & Label Artworks
We make sure that all the artworks & labels have been approved 2 times; once at the beginning when pdf files are approved by client, and secondly also take approvals of the printed panels to ensure that the print matches the correct Pantone shade colour.
Â
In-process controls
During production the proper installation of the machineries and plants and the observance of the job instructions are supervised in both shifts.
The following controls showing compliance with the design type approval is being carried out:
Kind of controls | Period of controls |
General external condition | Every FIBC |
Determination of the dimensions | 1 FIBC of 250, minimum 1 per order |
Condition of the glued, welded and sewn connections | Every FIBC |
Condition of the filling and closing equipments | 1 FIBC per order |
Correctness, durability and legibility of the UN-marking | Every FIBC |
Final Inspections And Tests
The final inspections include the following tests:
Kind Tests | Test Intervals *) |
Drop test | 1 FIBC per order, minimum 1 of 1000 |
Topple test | 1 FIBC per order, minimum 1 of 1000 |
Righting test | 1 FIBC per order, minimum 1 of 1000 |
Top lift test | 1 FIBC per order, minimum 1 of 1000 |
General external condition | 1 FIBC per order, minimum 1 of 1000 |
Condition of the sewn, welded and glued connections | 1 FIBC per order, minimum 1 of 1000 |
Correctness, durability and legibility of the Bag | 1 FIBC per order, minimum 1 of 1000 |
In special cases other test schedules and intervals can be agreed in our factory with the Competent Authority and/or the Third Party Inspector.
Controls 2- Corrective Action Plan
If mistakes relevant to safety occur during production the marking of bag shall be made Permanently unrecognizable by a suitable procedure and such FIBCs shall be precluded from usage as Hazard Goods Packaging. UN Certified packaging.
Completeness And Correctness Of The User’s Documentation
The completeness and accuracy of the documents (approval documents, operation and instruction manuals) is guaranteed for each slot.
FOR MORE INFORMATION PLEASE SEND US YOUR DETAILS, AND OUR SALES TEAM WILL BE IN CONTACT WITH YOU-